MahaRERA Project Verification 2026: How to Check a Builder, Project Approvals, Litigation and Construction Progress Before Booking a Flat in Pune
Buying a flat in Pune is a major financial decision. Whether you are considering a new apartment in Wakad, an under-construction project in Hinjawadi, a premium residence in Baner or a township in Tathawade, the decision should involve more than comparing prices, amenities and sample flats. Before paying a booking amount, you should understand who […]

Buying a flat in Pune is a major financial decision. Whether you are considering a new apartment in Wakad, an under-construction project in Hinjawadi, a premium residence in Baner or a township in Tathawade, the decision should involve more than comparing prices, amenities and sample flats.
Before paying a booking amount, you should understand who legally owns the land, whether the project has the required approvals, whether the developer has disclosed pending litigation, and whether construction is progressing according to the declared schedule.
This is where MahaRERA project verification becomes an important part of your property-buying process.
Imagine visiting a residential project in West Pune. The sales team shows you an impressive brochure, a sample apartment and an attractive payment plan. The possession date sounds reasonable, and you are encouraged to book quickly because only a few apartments are available.
But have you checked whether the building configuration matches the approved plans? Have you examined the project’s registered completion date? Do you know whether the promoter has disclosed any encumbrances or pending legal proceedings?
These are questions worth answering before committing your money.
The Maharashtra Real Estate Regulatory Authority (MahaRERA) provides a regulatory framework through which homebuyers can examine important project and promoter disclosures. However, registration is only one part of due diligence. Buyers must also independently examine legal documents, statutory permissions and actual construction progress.
This guide explains how to check MahaRERA project details, verify a builder, examine approvals and identify potential risks before booking a flat in Pune.
1. What Is MahaRERA and Why Should Every Pune Homebuyer Check It?
Maharashtra Real Estate Regulatory Authority (MahaRERA) is the state regulatory authority established under the Real Estate (Regulation and Development) Act, 2016.
The RERA framework was introduced to improve transparency, accountability and consumer protection in the real estate sector.
For homebuyers in Maharashtra, MahaRERA provides access to important information about registered residential and commercial projects, promoters, project timelines and regulatory disclosures.
What does MahaRERA registration mean?
Under Section 3 of the RERA Act, promoters generally cannot advertise, market, book, sell or offer apartments in a covered real estate project without registering it with the relevant regulatory authority.
The Act provides exemptions, including projects where the land area does not exceed 500 square metres or the number of apartments does not exceed eight, inclusive of all phases, subject to the applicable state provisions. Renovation or repair work without new marketing, advertising or allotment is also covered by an exemption.
Importantly, every phase of a project is treated as a standalone real estate project for registration purposes.
What information can homebuyers examine?
Depending on the project’s disclosures and applicable requirements, buyers can examine:
- Project registration number and validity.
- Legal promoter details.
- Project location and development details.
- Proposed completion date.
- Approved layout and building plans.
- Commencement Certificates and other approvals.
- Land title and encumbrance disclosures.
- Details of ongoing construction.
- Quarterly progress reports.
- Project-related complaints and regulatory orders.
What protection does RERA provide?
Some important statutory provisions include:
| RERA provision | What it means for buyers |
|---|---|
| Section 3 | Prior registration of covered projects |
| Section 11 | Promoter’s duties and project disclosures |
| Section 12 | Responsibility for incorrect advertisements and prospectuses |
| Section 13 | Restrictions on advance payments before an Agreement for Sale |
| Section 14 | Adherence to sanctioned plans and specifications |
| Section 18 | Remedies relating to delayed possession |
| Section 19 | Rights and duties of allottees |
An important distinction: MahaRERA registration is not a government guarantee that a project will be completed on time or that every aspect of the property is legally and technically sound.
It should be treated as an important verification source, not a substitute for independent legal, financial and technical due diligence.
2. How to Check a MahaRERA Project Online in 2026
One important development for Maharashtra homebuyers is the transition to the MahaCRITI digital platform.
MahaCRITI stands for MahaRERA Complaint and Regulatory Integrated Technology Implementation.
MahaRERA’s Order No. 65A/2026 provided for closure of the old MahaRERA IT system from 11 May 2026. New project-related applications, including registrations, corrections, extensions and quarterly reporting, were moved to the new platform. MHRERA |Circulars and Orders+2
Official portal
MahaRERA official websiteVisit the official MahaRERA website
Use the official website to access the current MahaCRITI services. Avoid relying on old bookmarked MahaRERA 1.0 search pages or third-party websites for final verification.
Step-by-step project verification
Step 1: Open the official website
Visit the MahaRERA website and navigate to the registered-project search facility available through the current platform.
Step 2: Search for the project
Use one or more of the following:
- Project name.
- MahaRERA registration number.
- Promoter’s legal name.
- Location or other available search filters.
If the project name produces multiple results, do not select the first result automatically.
Step 3: Confirm the correct project
Check the following details:
- Exact project name.
- Legal promoter name.
- Survey number or land identification details, where disclosed.
- Project address.
- District and location.
- MahaRERA registration number.
- Project phase or building details.
For example, a developer may market an entire township under one brand name, but its individual phases may have separate registrations.
Step 4: Examine registration validity
Check:
- Original registration date.
- Registered completion date.
- Current registration status.
- Approved extensions, if any.
- Any regulatory restrictions or orders.
Do not assume that a registration certificate issued several years ago remains sufficient evidence of the project’s current status.
Step 5: Examine project disclosures
Open the available project documents and examine:
- Registration certificate.
- Sanctioned plans.
- Commencement Certificates.
- Title-related documents.
- Encumbrance disclosures.
- Approvals and permissions.
- Project progress updates.
- Promoter declarations.
Step 6: Download and preserve records
Save relevant documents in a separate folder for your proposed property purchase.
Record the date on which you accessed the information. This is useful when comparing later updates with the original disclosures.
Example: A hypothetical Pune project
Suppose you are considering a 2 BHK apartment in a residential development in Punawale.
The developer’s brochure mentions five towers, a clubhouse and possession in December 2029.
Before booking, search the project using its MahaRERA registration number.
You discover that the project has multiple phases. The registration details for the phase containing your proposed apartment show a different completion date from the brochure.
This difference deserves clarification.
Ask the developer for the registered phase details, the relevant approved plans and the basis for the advertised possession date. Have your lawyer compare the documents before you commit.
Practical tip: Always verify the exact building, wing and phase in which your apartment is located. A registration number for another phase of the same township does not establish that your proposed apartment is covered by that registration.
3. How to Verify the Builder or Promoter’s Credentials
A familiar developer brand does not necessarily mean that the same legal entity is responsible for every project.
For example, a developer may market several projects under one brand, while each project is developed through a separate company or special-purpose vehicle.
This is why checking the legal promoter is essential.
What should you verify?
| Verification item | What to examine |
|---|---|
| Legal promoter name | Exact entity registered with MahaRERA |
| Company details | CIN and corporate identity, where applicable |
| Promoter address | Registered and disclosed business address |
| Past projects | Previous registered projects and completion records |
| Previous registrations | Extensions, lapses or revoked registrations |
| Complaints | Nature and outcome of relevant complaints |
| Regulatory orders | Directions, penalties and compliance history |
| Financial disclosures | Available project-related financial information |
Check the developer’s previous projects
Do not judge a builder only by the appearance of its completed properties.
Look at the developer’s actual delivery history.
Ask:
- Has the developer completed previous projects?
- Were possession dates broadly consistent with registered timelines?
- Were occupancy certificates obtained?
- Are there unresolved complaints involving construction or possession?
- Have previous projects experienced registration extensions?
- Has the promoter complied with relevant regulatory directions?
A delayed project is not automatically evidence of fraud. Equally, a developer’s successful past projects do not guarantee the performance of a new project.
Check the corporate entity
For a company or LLP, cross-check the disclosed legal identity using the Ministry of Corporate Affairs portal.Ministry of Corporate Affairs – Company and LLP information
Compare the legal name and CIN with the details shown in the project documents.
Also ask whether the landowner, development partner and promoter are separate entities.
The objective is to understand who owns the land, who has development rights and which entity is legally responsible for the obligations in your Agreement for Sale.
4. How to Verify Land Title and Ownership
This is one of the most important parts of property due diligence.
A project may have a MahaRERA registration, attractive construction and a reputed developer, but buyers should still examine whether the promoter has valid rights over the land.
What is a property title?
A property title refers to the legal ownership or legally recognised rights over a property.
For a residential development, the buyer’s lawyer should examine the land ownership and the chain of documents establishing how the land came into the possession or control of the current owner or developer.
Documents worth examining
1. Title Certificate or Title Report
Request the title report prepared by the project’s legal professional.
It should explain the ownership history and identify relevant title-related issues.
Do not treat a title report as an automatic guarantee. Ask your independent lawyer to review its findings and underlying documents.
2. Chain of Title
This establishes how ownership or rights in the land have passed from previous owners to the present owner.
Your lawyer should examine the relevant sale deeds, conveyances, inheritance documents and other instruments.
3. Development Agreement
If the landowner has appointed a developer, examine the development agreement.
It should establish the nature and extent of the developer’s rights.
4. Power of Attorney
Where a Power of Attorney is involved, verify its validity, scope, execution and whether it authorises the relevant transactions.
5. Encumbrance Details
Check whether the land is subject to:
- Mortgage or charge.
- Existing loans.
- Third-party claims.
- Easements.
- Court attachments.
- Other registered interests.
An encumbrance disclosure should be compared with the underlying title and registration records.
6. Land-use Permissions
Confirm that the land has the necessary permissions for the proposed development and that the relevant planning authority has approved the intended use.
Where can you verify property registration records?
IGR MaharashtraVisit the Inspector General of Registration, Maharashtra
The IGR Maharashtra website provides access to registration-related services.
Depending on the available service and document, buyers and their lawyers can examine registered instruments and relevant property records.
However, a simple online search or Index II document does not establish a complete and marketable title.
Our recommendation: Obtain an independent title search and legal opinion covering the relevant ownership history, land rights, encumbrances and development permissions before booking.
5. How to Check Approved Building Plans and Commencement Certificates
A project brochure may show a particular tower configuration, number of floors, clubhouse, parking arrangements and amenities.
But what matters is whether the proposed development is supported by the necessary approvals from the competent planning authority.
What is a sanctioned building plan?
A sanctioned plan is a building or layout plan approved by the competent planning authority.
It specifies the permitted development, including relevant building configurations and other planning details.
What is a Commencement Certificate?
A Commencement Certificate (CC) is a permission issued by the competent authority allowing construction to commence to the extent specified in the certificate and associated approvals.
A buyer should not assume that one CC automatically permits construction of every tower or floor in a large development.
What should you examine?
- Approved layout plan.
- Sanctioned building plans.
- Commencement Certificate.
- Permitted building height and floors.
- Tower and wing configuration.
- Relevant floor-wise permissions.
- Approved flat configuration.
- Parking and common-area provisions.
- Revised or amended approvals.
Why is floor-wise permission important?
Consider a project in Wakad with four residential towers.
The developer may have received commencement permission for the initial construction stages, while additional floors or towers may be subject to subsequent approvals.
Ask for the latest approval covering the specific tower and floor in which you intend to purchase.
Compare it with the MahaRERA disclosures and the apartment details in the sales documentation.
Which authority should you check in Pune?
The applicable authority depends on the exact land location and planning jurisdiction.
| Area or jurisdiction | Authority to check |
|---|---|
| Areas within PMC limits | Pune Municipal Corporation |
| Areas within PCMC limits | Pimpri-Chinchwad Municipal Corporation |
| Areas under PMRDA jurisdiction | Pune Metropolitan Region Development Authority |
| Other notified or special planning areas | Relevant competent planning authority |
Do not assume that a project is under PMRDA simply because its address is described as Pune or West Pune.
Official approval resources
PMRDAPune Metropolitan Region Development Authority
PMRDA has introduced online development permission services through Maharashtra’s building permission system. PMRDA+1
PCMCPimpri-Chinchwad Municipal Corporation
PCMC’s building permission documentation describes commencement, plinth and occupancy-related permission processes. PCMC+1
For a PMC project, request the relevant building permission and commencement records through the corporation’s building permission system or the applicable official records facility. autodcr.pmc.gov.in+1
6. How to Check Environmental and Other Statutory Approvals
Not every residential project requires the same approvals.
Requirements depend on the project’s size, location, development characteristics, applicable laws and planning authority.
A buyer should therefore avoid relying on a generic checklist without establishing which permissions actually apply.
Important approvals to examine
| Approval | Why it matters |
|---|---|
| Environmental Clearance | Required for projects falling within the applicable environmental clearance framework |
| Fire NOC | Relevant fire safety approval, where applicable |
| Water permissions | Verification of the permitted or approved water supply arrangements |
| Airport height clearance | Relevant where aviation height restrictions apply |
| Tree permissions | Applicable where tree removal or related permissions are required |
| Pollution control permissions | Applicable to activities or project components requiring such consent |
| Local authority approvals | Permissions required by the competent planning authority |
How to check Environmental Clearance
The Ministry of Environment, Forest and Climate Change operates the PARIVESH portal.
PARIVESH – Government of IndiaVisit the PARIVESH portal
The portal supports online submission and monitoring of environmental, forest, wildlife and coastal regulation zone clearance proposals. Parivesh+1
Buyers can search relevant proposal information and examine available clearance documents.
Where an Environmental Clearance is applicable, compare the project identity, location, conditions and approved development with the property being marketed.
Do not assume that every project needs an Environmental Clearance or that an application under consideration is equivalent to a final approval.
How to verify water availability
Water supply deserves particular attention in developing areas of Pune’s western corridor.
For projects in locations such as Hinjawadi, Tathawade, Punawale, Ravet and Mahalunge, buyers should ask:
- Which authority or agency will supply water?
- Is the supply arrangement approved?
- Is the project dependent on tankers?
- Are there any restrictions or conditions?
- Does the proposed infrastructure support the number of apartments?
You can also refer to our guide on PMRDA Water Availability Certificate and what Pune homebuyers should know.
Do not rely solely on a sales representative’s verbal assurance that permanent municipal water is available.
7. How to Check Pending Litigation and MahaRERA Complaints
Legal disputes are not always visible during a property site visit.
A project may look complete from the outside while certain ownership, contractual, regulatory or construction-related disputes remain unresolved.
This does not mean that every project with a complaint is unsafe. The important task is to understand the nature and status of the dispute.
Step 1: Search for MahaRERA complaints
Use the current official MahaRERA/MahaCRITI platform.
Where complaint search facilities are available, search using:
- Project name.
- MahaRERA registration number.
- Promoter name.
- Complaint number.
Examine the available complaint details and associated documents.
Step 2: Read the final orders
A complaint and an order are not the same thing.
Check whether the matter is:
- Newly filed.
- Pending.
- Decided.
- Withdrawn.
- Settled.
- Subject to appeal.
- Closed following compliance.
Read the operative part of the order rather than relying only on its title.
Step 3: Examine other relevant disputes
Depending on the project’s circumstances, your lawyer may also examine:
- Civil court proceedings.
- Land ownership disputes.
- Consumer commission proceedings.
- Insolvency proceedings.
- Mortgage enforcement proceedings.
- Appeals before the Real Estate Appellate Tribunal.
How should you interpret a complaint?
Consider this hypothetical example.
A buyer files a complaint against a developer alleging delay in possession.
The complaint is still pending.
It would be inaccurate to describe the developer as having been found guilty merely because the complaint exists.
Instead, examine the allegations, the response, the procedural status and any final order.
Important: For significant land disputes, insolvency proceedings or ownership claims, obtain an independent legal opinion. A project search on MahaRERA is not a substitute for a comprehensive litigation search.
8. How to Check Construction Progress on MahaRERA
A project’s progress is one of the most useful indicators for an under-construction property buyer.
A developer may announce that construction is progressing quickly, but buyers should compare those statements with the project’s official disclosures and physical site conditions.
What is a Quarterly Progress Report?
A Quarterly Progress Report (QPR) is a periodic project update filed by the promoter as required under the applicable MahaRERA framework.
It provides information about relevant project milestones and updates.
MahaRERA’s QPR-related directions address project progress, changes in encumbrances and other important project disclosures. They also provide for action in cases of non-submission. MahaRERA+1
What should you examine?
- Latest available quarterly update.
- Building-wise construction status.
- Completion of relevant construction milestones.
- Changes in project details.
- Changes in encumbrances.
- Status of the association of allottees, where applicable.
- Conveyance-related updates, where applicable.
- Disclosed completion timeline.
Compare declared progress with actual site progress
Suppose a residential project in Hinjawadi has three towers.
The latest project disclosure indicates that the structural work of one tower is substantially complete, while the other towers remain at earlier construction stages.
During your site visit, examine whether the actual progress appears consistent with the disclosed information.
Ask for an explanation if there are significant differences.
Questions to ask during a site visit
- Which tower is currently under construction?
- How many floors have been completed?
- Has the sanctioned construction stage been reached?
- Are lifts, electrical and plumbing installations progressing?
- Has the clubhouse construction started?
- Are internal roads and infrastructure being developed?
- Are the amenities shown in the brochure part of the approved project?
Where possible, obtain dated construction photographs and written updates.
Remember that a site visit provides a visual assessment, not a professional structural inspection.
What if the QPR is missing?
A missing or overdue report deserves attention.
Ask the promoter for an explanation and verify whether the official platform shows a compliance notice or other regulatory action.
Do not automatically conclude that the project is fraudulent. Equally, do not ignore repeated reporting gaps.
9. How to Verify the Possession Date
Possession dates are among the most important details for homebuyers.
A family purchasing a flat in Wakad or Baner may be planning a school admission, relocation, loan repayment schedule or sale of an existing home around the expected possession date.
A delay can therefore have substantial financial and practical consequences.
Understand the difference between three dates
| Date | Meaning |
|---|---|
| Marketing possession date | Date communicated in advertisements or sales presentations |
| Registered completion date | Date disclosed in the MahaRERA registration or applicable updated record |
| Contractual possession date | Date and conditions specified in the registered Agreement for Sale |
These dates should be examined together.
Do not assume that an advertised date automatically replaces the date specified in the registered documents.
Check for project extensions
If the original completion date has changed, examine:
- Whether an extension was applied for.
- Whether MahaRERA approved the extension.
- The reason recorded for the extension.
- The revised completion date.
- Any associated regulatory conditions.
Section 6 of the RERA Act deals with extension of registration. An extension should not be treated as an informal change in the builder’s brochure. India Code+1
What is an Occupancy Certificate?
An Occupancy Certificate (OC) is issued by the competent authority after the relevant requirements for occupation have been met.
Before accepting possession, verify:
- Whether the OC has been issued.
- Whether it covers your particular building or wing.
- Whether it covers the relevant floors.
- Whether it is a full or part OC.
- Whether the apartment falls within the approved occupied portion.
A part OC should never be assumed to cover the entire project.
What happens if the builder delays possession?
Section 18 of the RERA Act provides remedies in specified circumstances where the promoter fails to complete or hand over possession in accordance with the Agreement for Sale or the applicable committed date.
Depending on the circumstances, an allottee who withdraws may claim a refund with applicable interest and compensation. An allottee who remains in the project may be entitled to interest for each month of delay, subject to the law and applicable facts. IndiaCode+1
Obtain legal advice before deciding whether to withdraw, continue with the purchase or initiate proceedings.
10. Seven Red Flags to Watch Before Booking a Flat in Pune
Even after reviewing the project disclosures, look carefully for inconsistencies.
| Red flag | Why it matters | What you should do |
|---|---|---|
| 1. Missing or inconsistent MahaRERA details | The project or phase may not be covered by the registration shown | Verify the exact registration and seek written clarification |
| 2. Unapproved building configuration | Marketing plans may differ from sanctioned plans | Obtain approved plans and have them reviewed |
| 3. Unclear land title | Ownership or development rights may be disputed | Commission an independent title search |
| 4. Construction progress mismatch | Actual progress may not match disclosed milestones | Compare QPR records with a site visit |
| 5. Repeated possession-date extensions | May indicate delays or execution difficulties | Examine extension orders and contractual dates |
| 6. Serious unresolved litigation | May affect ownership, development or project delivery | Have a lawyer examine the proceedings and orders |
| 7. Pressure to pay immediately | You may be asked to commit before reviewing documents | Request the paperwork and payment terms before proceeding |
A practical rule for homebuyers
If a developer or sales representative cannot provide a clear explanation for a material difference between the brochure, approved plans, registration details and Agreement for Sale, pause the booking process.
A genuine property opportunity should withstand reasonable due diligence.
11. MahaRERA Verification Checklist Before Paying a Booking Amount
Use this checklist when comparing residential projects in Pune.
| No. | Verification item | What to check | Where to verify |
|---|---|---|---|
| 1 | Project registration | Valid registration number and status | MahaRERA |
| 2 | Project phase | Correct phase, tower and wing | MahaRERA and promoter |
| 3 | Promoter identity | Exact legal entity | MahaRERA and MCA |
| 4 | Registration validity | Registered and revised completion dates | MahaRERA |
| 5 | Land ownership | Title and ownership documents | Independent lawyer |
| 6 | Chain of title | Previous ownership instruments | Property records and lawyer |
| 7 | Encumbrances | Mortgage, charges and other claims | Title search and disclosed records |
| 8 | Development rights | Development agreement and POA, where applicable | Independent lawyer |
| 9 | Sanctioned plans | Approved layout and building configuration | Planning authority |
| 10 | Commencement Certificate | Permissions for relevant construction stages | Planning authority |
| 11 | Environmental clearance | Applicable clearance and conditions | PARIVESH |
| 12 | Fire and other NOCs | Applicable approvals | Relevant authorities |
| 13 | Water arrangements | Approved supply arrangements | Planning or supply authority |
| 14 | Litigation | Complaints, disputes and orders | MahaRERA and relevant courts |
| 15 | Construction progress | Latest QPR and actual site status | MahaRERA and site visit |
| 16 | Possession date | Registered and contractual dates | MahaRERA and Agreement for Sale |
| 17 | Occupancy Certificate | Relevant building and floor coverage before possession | Competent authority |
| 18 | Agreement for Sale | Payment schedule, possession and specifications | Independent lawyer |
| 19 | Carpet area | RERA carpet area and agreement details | MahaRERA and agreement |
| 20 | Parking and amenities | Agreed provisions and applicable disclosures | Agreement and approved documents |
This is a recommended buyer due-diligence checklist, not a statement that every document or approval applies to every project.
12. Is MahaRERA Registration Alone Enough to Buy a Property?
No.
MahaRERA registration is an important starting point, but it should not be the only factor in your purchase decision.
Think of property due diligence as four separate assessments.
Four pillars of property verification
1. Legal due diligence
Ownership, title, development rights, encumbrances, litigation and contractual documents.
2. Regulatory due diligence
MahaRERA registration, sanctioned plans, CC, environmental permissions and relevant NOCs.
3. Technical due diligence
Construction quality, structural condition, site progress and infrastructure readiness.
4. Financial due diligence
Total acquisition cost, payment schedule, loan terms, maintenance charges and affordability.
For an under-construction property, buyers should also understand the promoter’s obligations regarding sanctioned plans and specifications.
Section 14(3) of the RERA Act provides for rectification of specified structural and other defects brought to the promoter’s notice within five years from handing over possession, subject to the statutory conditions. The provision specifies a 30-day period for rectification. MHRERA+1
A buyer should not confuse this statutory obligation with an unconditional warranty covering every possible problem.
Before signing the Agreement for Sale
Pay particular attention to:
- Apartment identification and carpet area.
- Total consideration.
- Payment milestones.
- Possession date.
- Interest and default provisions.
- Cancellation and refund terms.
- Parking provisions.
- Amenities and specifications.
- Rights relating to changes in plans.
- Applicable taxes and additional charges.
Section 13 restricts a promoter from accepting more than 10% of the apartment, plot or building cost as an advance or application fee without first entering into a written and registered Agreement for Sale. IndiaCode+1
Have your lawyer examine the agreement before signing or making substantial payments.
13. Frequently Asked Questions About MahaRERA Project Verification
1. How can I check whether a Pune property is MahaRERA registered?
Visit the official MahaRERA website and access the current registered-project search facility through MahaCRITI. Search using the project name or registration number. Confirm the legal promoter, project location, phase and registration status.
2. How can I verify a MahaRERA registration number?
Enter the registration number in the official project search facility. Compare the result with the number displayed in the developer’s advertisement, brochure and booking documents. Ensure that all details refer to the same project and phase.
3. What is the official MahaRERA project search portal?
The official starting point is maharera.maharashtra.gov.in. Access the current MahaCRITI services through the official website.
4. What is the MahaCRITI portal?
MahaCRITI stands for MahaRERA Complaint and Regulatory Integrated Technology Implementation. It is MahaRERA’s digital platform for project lifecycle management, complaints, agent services and other regulatory processes.
5. Can I buy a flat if the builder has not obtained MahaRERA registration?
First determine whether the project is legally required to be registered or falls within an applicable statutory exemption. If registration is mandatory and has not been obtained, do not proceed with booking without independent legal advice and clarification from the authority.
6. Is MahaRERA registration proof of clear property title?
No. Registration does not independently guarantee clear and marketable title. Buyers should obtain a title search, examine ownership documents, development rights and encumbrances through an independent property lawyer.
7. How do I check builder complaints on MahaRERA?
Search the project or promoter using the complaint search facility on the official platform. Examine the complaint number, allegations, case status, orders and any subsequent appeal or compliance information.
8. How can I check pending litigation against a project?
Start with MahaRERA complaints and regulatory orders. Ask an independent lawyer to conduct additional searches of relevant court, tribunal, consumer commission and insolvency proceedings, depending on the circumstances.
9. How do I verify a Commencement Certificate?
Request a copy from the developer and verify its authenticity with the competent planning authority. Check the approved building, wing, floors and construction scope covered by the certificate.
10. How can I check whether a building plan is approved?
Request the latest sanctioned layout and building plans. Compare the plans with the MahaRERA disclosures and the proposed apartment configuration. Verify the approval with the relevant PMC, PCMC, PMRDA or other competent authority.
11. How do I check quarterly construction progress?
Access the project’s available progress disclosures through MahaCRITI. Examine the latest quarterly update, building-wise milestones and other relevant disclosures. Compare the reported progress with an actual site visit.
12. Can the builder change the possession date?
A revised possession date should not be treated as an informal marketing change. Examine the registered project details, applicable extension orders and your Agreement for Sale. The legal effect depends on the circumstances and applicable provisions.
13. What happens if a builder delays possession?
Section 18 of RERA provides remedies in specified circumstances, including refund with applicable interest and compensation for an allottee who withdraws, or interest for delay for an allottee who continues with the project. Seek legal advice about your specific circumstances.
14. Is a part Occupancy Certificate sufficient?
It may be sufficient for occupation of the particular portion covered by the certificate, subject to its conditions and applicable requirements. Verify that your exact building, wing and apartment fall within the approved portion.
15. How do I check whether a project has environmental clearance?
Use the PARIVESH portal to search relevant proposals and clearance records. First establish whether Environmental Clearance is applicable to the particular project.
16. What documents should I ask for before paying a booking amount?
Request the MahaRERA registration details, title report, sanctioned plans, relevant commencement permissions, applicable statutory approvals, project disclosures, apartment details, draft Agreement for Sale and complete cost sheet.
17. Can a MahaRERA registration expire?
Project registration has a validity period. Extensions may be granted under Section 6, subject to applicable conditions. Check the current registration status and any approved extension rather than relying on the original certificate alone.
18. How do I check whether a project phase is separately registered?
Search the phase or building details on MahaRERA using the project name or registration number. Under Section 3, each phase of a phased development is treated as a standalone project for registration purposes.
19. Should I hire a property lawyer before booking a flat?
Yes. An independent property lawyer can examine land title, ownership history, development rights, encumbrances, litigation, statutory permissions and the Agreement for Sale. This is particularly important for under-construction projects.
20. What should I do if MahaRERA details differ from the builder’s brochure?
Do not ignore the discrepancy. Request a written explanation and supporting documents from the developer. Compare the information with the latest official disclosures and approved plans. Have your lawyer review any material difference before making payment.
14. Conclusion: Verify Before You Invest in a Pune Property
Buying a home should be an informed decision, not one driven by attractive brochures, limited-period offers or pressure from sales representatives.
Whether you are purchasing an apartment in Hinjawadi, Wakad, Baner, Balewadi, Tathawade, Punawale, Ravet, Kiwale or another developing area of Pune, take the time to examine the project’s legal, regulatory and construction details.
MahaRERA provides an important starting point for understanding a project’s registration, promoter disclosures, progress and regulatory history. However, complete due diligence also requires independent verification of land title, approved plans, statutory permissions, construction quality and contractual terms.
At VJ Real Estate, we believe that homebuyers should understand what they are purchasing before committing their savings.
Our approach focuses on research-driven property shortlisting, developer comparisons, location analysis, documentation awareness and informed decision-making.
Before you book your next home in Pune, verify the project, understand the documents and make your decision with confidence.